Things to note before purchasing a new energy electric vehicle charging station

2024-09-24 15:04:06226Hippo

First, you need to determine whether your community can install home charging piles, whether you need to report in advance, whether the line is commonly used 220V or can be pulled to 380V.

If it is a 220V meter: just consider the 7KW charging pile. If it is a 380V meter: you can consider 11KW and 21KW charging piles. Don't worry that the 7KW charging pile is not enough. Charging for 8.5 hours a night can charge about 60 degrees of electricity, which is completely enough.

Preparation of personal charging pile meter registration materials

Source of electricity: State Grid, own meter, community property and company, etc.

Applying for a new energy meter is very simple. You can apply in "State Grid". After choosing your own installation location, property certificate, identity certificate, and a series of materials such as car purchase certificate, it can generally be installed in no more than a week.

On-site survey and installation of meters, purchase of charging piles

Don't buy blindly when purchasing charging piles. Branded charging piles must comply with national standards and have a certain reputation. Big brands are better in product quality, safety protection and waterproof coefficient.

When buying charging piles online, remember to communicate with the customer service, tell them your brand and model, and ask them to help you determine the charging pile and ask about all the fees, such as installation fees and wire fees. Try not to buy small brands or products without any warranty, because there is no way to guarantee the quality and after-sales service, and there is no way to guarantee that the vehicle will not be damaged during use. Don't just care about the price, choose the one with the best cost performance.

Online
Phone
Pre sales consultation

13800000000

After-sales Consulting

13800000000

Wechat
Wechat

Wechat

Top